Roads & Highways

Design Review and Supervision of the Thaba-Tseka – Katse Road Upgrading Project

Client: Ministry of Public Works and Transport – Roads Directorate
Location: Lesotho
Status: Ongoing

Project Description

In 2025, LASA proudly expanded its global footprint by entering a new market — the Kingdom of Lesotho. We have been awarded the Design Review and Supervision of the Thaba-Tseka – Katse Road Upgrading project by the Ministry of Public Works and Transport – Roads Directorate. This transformative infrastructure initiative, known as LITTL-P, is set to redefine connectivity in the region and is anticipated to be delivered over the next five years. This strategic road project would close the missing link from the Thaba-Tseka district to the Maseru and Leribe districts, which are key economic and export hubs

Project Objective: 
To enhance climate-resilient regional connectivity along the Katse–Thaba Tseka corridor and reduce costs at three of Lesotho’s key commercial borders with South Africa by:
  • Reducing travel time along the A8 corridor.
  • Improving road user benefits through lower vehicle operating costs.
  • Reducing end-to-end border crossing time through smart border systems at Maseru Bridge and Maputsoe-Ficksburg crossings.
 Services: 
  • Reviewing and updating the current design with climate resilience provisions and revised cost estimates.
  • Reviewing and updating bidding documents to ensure compliance with World Bank Procurement Regulations (Sept 2023 edition) and Standard Bidding Documents, including Rated Criteria.
  • Supporting the Employer during the tender process.
  • Providing construction supervision, quality control, technical advice, and dispute adjudication support.
  • Delivering all post-contract services.
X